Facility Integrated Contingency Planning: for Emergency Response and Planning - Thomas Socha - Libros - iUniverse - 9780595247813 - 17 de octubre de 2002
En caso de que portada y título no coincidan, el título será el correcto

Facility Integrated Contingency Planning: for Emergency Response and Planning

Precio
Mex$ 392
sin IVA

Pedido desde almacén remoto

Entrega prevista 19 de jun. - 7 de jul.
Añadir a tu lista de deseos de iMusic

The Integrated Contingency Plan (ICP) will minimize duplication in the preparation and use of emergency response plans at the same facility and will improve economic efficiency for both the regulated and regulating communities. Facility expenditures for the preparation, maintenance, submission, and update of a single plan should be much lower than for multiple plans. The ICP format provided in this one-plan guidance is organized into three main sections: an introductory section, a core plan, and a series of supporting annexes.

Medios de comunicación Libros     Paperback Book   (Libro con tapa blanda y lomo encolado)
Publicado 17 de octubre de 2002
ISBN13 9780595247813
Editores iUniverse
Páginas 262
Dimensiones 150 × 15 × 225 mm   ·   390 g
Lengua Inglés  

Mas por Thomas Socha

Mostrar todo