Estimating Required Contingency Funds for Construction Projects Using Multple Linear Regression - Jason J Cook - Libros - Biblioscholar - 9781288332021 - 21 de noviembre de 2012
En caso de que portada y título no coincidan, el título será el correcto

Estimating Required Contingency Funds for Construction Projects Using Multple Linear Regression

Precio
Mex$ 1.072
sin IVA

Pedido desde almacén remoto

Entrega prevista 1 - 16 de jun.
Añadir a tu lista de deseos de iMusic

Publisher Marketing: Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund. This research seeks to identify significant factors that may influence, or serve as indicators of, potential cost overruns. The study uses data on 243 construction projects over a full range of project types and scopes gathered from an existing United States Air Force construction database. The author uses multiple linear regression to analyze the data and compares the proposed model to the common practice of assigning contingency funds. The multiple linear regression model provides better predictions of actual cost overruns experienced. Based on the performance metric used, the model sufficiently captures 44% of actual cost overruns versus current practices capturing only 20% The proposed model developed in this study only uses data that would be available prior to the award of a construction contract. This allows the model to serve as a planning tool throughout the concept and design phases. The model includes project characteristics, design performance metrics, and contract award process influences.

Medios de comunicación Libros     Paperback Book   (Libro con tapa blanda y lomo encolado)
Publicado 21 de noviembre de 2012
ISBN13 9781288332021
Editores Biblioscholar
Páginas 68
Dimensiones 189 × 246 × 4 mm   ·   140 g