Recomienda este artículo a tus amigos:
Construction Scheduling with Suretrak 3.0 Dr. Mohamed Hegab
Construction Scheduling with Suretrak 3.0
Dr. Mohamed Hegab
The book covers the use of the SureTrak® software in easy format by walking through the software in a way similar to the practical use of the software which makes it easy to apply. It has project examples which allow user to grasp the concept and us the software efficiently. SureTrak® is planning and scheduling software that is trademarked and owned by Oracle that can be used in any industry including building, construction, oil & gas and software development.
| Medios de comunicación | Libros Paperback Book (Libro con tapa blanda y lomo encolado) |
| Publicado | 1 de febrero de 2011 |
| ISBN13 | 9781456433123 |
| Editores | CreateSpace Independent Publishing Platf |
| Páginas | 188 |
| Dimensiones | 10 × 203 × 254 mm · 385 g |
| Lengua | Inglés |
Los regalos de Navidad se podrán canjear hasta el 31 de enero