Standard Review Plan for in Situ Leach Uranium Extraction License Applications: Final Report - J. Lusher - Libros - CreateSpace Independent Publishing Platf - 9781500308773 - 24 de junio de 2014
En caso de que portada y título no coincidan, el título será el correcto

Standard Review Plan for in Situ Leach Uranium Extraction License Applications: Final Report

Precio
Mex$ 481
sin IVA

Pedido desde almacén remoto

Entrega prevista 24 de ago. - 9 de sep.
Recibe notificaciones sobre nuevos lanzamientos de J. Lusher
Añadir a tu lista de deseos de iMusic

Aún no valorado

The U. S. Nuclear Regulatory Commission (NRC) has developed a Standard Review Plan (NUREG?1569) which provides guidance for staff reviews of applications to develop and operate uranium in situ leach facilities. Under the provisions of Title 10 of the Code of Federal Regulations, Part 40 (10 CFR Part 40), Domestic Licensing of Source Material, an NRC Materials License is required to conduct uranium recovery by in situ leach extraction techniques. Applicants for a new license and operators seeking an amendment or renewal of an existing license are required to provided detailed information on the facilities, equipment, and procedures used in the proposed activities. In addition, the applicant for a new license also provides an Environmental Report that discusses the effects of proposed operations on the health and safety of the public and assesses impacts to the environment. For amendment or renewal of an existing license, the original Environmental Report is supplemented, as necessary. This information is used by the NRC staff to determine whether the proposed activities will be protective of public health and safety and the environment and to fulfill NRC responsibilities under the National Environmental Policy Act (NEPA). The purpose of the Standard Review Plan (NUREG?1569) is to provide the NRC staff with guidance on performing reviews of information provided by the applicant, and to ensure a consistent quality and uniformity of staff reviews. Each section in the review plan provides guidance on what is to be reviewed, the basis for the review, how the staff review is to be accomplished, what the staff will find acceptable in a demonstration of compliance with the regulations, and the conclusions that are sought regarding the applicable sections in 10 CFR Part 40, Appendix A. NUREG?1569 is also intended to improve the understanding of the staff review process by interested members of the public and the uranium recovery industry. The review plan provides general guidance on acceptable methods for compliance with the existing regulatory framework. As described in an NRC white paper on risk-informed, performance-based regulation (SECY?98?144), however, the applicant has the flexibility to propose other methods as long as it demonstrates how it will meet regulatory requirements.

Medios de comunicación Libros     Paperback Book   (Libro con tapa blanda y lomo encolado)
Publicado 24 de junio de 2014
ISBN13 9781500308773
Editores CreateSpace Independent Publishing Platf
Páginas 264
Dimensiones 15 × 216 × 279 mm   ·   616 g
Lengua Inglés