Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Appendices a Through L - U.s. Nuclear Regulatory Commission - Libros - CreateSpace Independent Publishing Platf - 9781500611316 - 22 de julio de 2014
En caso de que portada y título no coincidan, el título será el correcto

Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Appendices a Through L

Precio
Mex$ 487
sin IVA

Pedido desde almacén remoto

Entrega prevista 23 de jun. - 9 de jul.
Añadir a tu lista de deseos de iMusic

The purpose of this NUREG is to establish the feasibility of developing a risk-informed and performance-based regulatory structure for the licensing of future nuclear power plants (NPPs). As such, this NUREG documents a ?Framework? that provides an approach, scope and criteria that could be used to develop a set of requirements that would serve as an alternative to 10 CFR 50 for licensing future NPPs; however, this Framework is not the entire process. It is an initial phase in is to demonstrate the feasibility of such a concept, recognizing that for full implementation there will be outstanding programmatic, policy, and technical issues to be resolved. As such, this feasibility study does not represent a staff position, but rather a significant piece of research. The second phase, which involves implementation, is comprised of several, iterative steps: resolution of issues, development of draft requirements and regulations, pilots and tests, and rulemaking.

Medios de comunicación Libros     Paperback Book   (Libro con tapa blanda y lomo encolado)
Publicado 22 de julio de 2014
ISBN13 9781500611316
Editores CreateSpace Independent Publishing Platf
Páginas 394
Dimensiones 216 × 279 × 21 mm   ·   911 g
Lengua Inglés  

Mas por U.s. Nuclear Regulatory Commission

Mostrar todo