Decommissioning Planning (Us Nuclear Regulatory Commission Regulation) (Nrc) (2018 Edition) - The Law Library - Libros - Createspace Independent Publishing Platf - 9781729752418 - 14 de noviembre de 2018
En caso de que portada y título no coincidan, el título será el correcto

Decommissioning Planning (Us Nuclear Regulatory Commission Regulation) (Nrc) (2018 Edition)


Recibe un correo electrónico cuando el artículo esté disponible
¿Tienes un perfil? Iniciar sesión
Recibe notificaciones sobre nuevos lanzamientos de The Law Library
Añadir a tu lista de deseos de iMusic

Aún no valorado

Decommissioning Planning (US Nuclear Regulatory Commission Regulation) (NRC) (2018 Edition) The Law Library presents the complete text of the Decommissioning Planning (US Nuclear Regulatory Commission Regulation) (NRC) (2018 Edition). Updated as of May 29, 2018 The U. S. Nuclear Regulatory Commission (NRC or the Commission) is amending its regulations to improve decommissioning planning and thereby reduce the likelihood that any current operating facility will become a legacy site. The amended regulations require licensees to conduct their operations to minimize the introduction of residual radioactivity into the site, which includes the site's subsurface soil and groundwater. Licensees also may be required to perform site surveys to determine whether residual radioactivity is present in subsurface areas and to keep records of these surveys with records important for decommissioning. The amended regulations require licensees to report additional details in their decommissioning cost estimate (DCE), eliminate the escrow account and line of credit as approved financial assurance mechanisms, and modify other financial assurance requirements. The amended regulations require decommissioning power reactor licensees to report additional information on the costs of decommissioning and spent fuel management. This book contains: - The complete text of the Decommissioning Planning (US Nuclear Regulatory Commission Regulation) (NRC) (2018 Edition) - A table of contents with the page number of each section

Medios de comunicación Libros     Paperback Book   (Libro con tapa blanda y lomo encolado)
Publicado 14 de noviembre de 2018
ISBN13 9781729752418
Editores Createspace Independent Publishing Platf
Páginas 136
Dimensiones 178 × 254 × 7 mm   ·   249 g
Lengua Inglés