Hydropower Development-a Case Study in Pakistan: Analyzing Interaction of Head in Reducing Power and Energy During Low Flows - Sajid Mahmood - Libros - VDM Verlag Dr. Müller - 9783639230994 - 20 de enero de 2010
En caso de que portada y título no coincidan, el título será el correcto

Hydropower Development-a Case Study in Pakistan: Analyzing Interaction of Head in Reducing Power and Energy During Low Flows


Recibe un correo electrónico cuando el artículo esté disponible
¿Tienes un perfil? Iniciar sesión
Recibe notificaciones sobre nuevos lanzamientos de Sajid Mahmood
Añadir a tu lista de deseos de iMusic

Aún no valorado

Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Ghazi-Barotha is a runoff river hydropower project located at downstream of Tarbela and on left bank of Indus River. The project was studied to feasibility level in 1990, implementation was started in 1995 and now in operation since 2003. The project is being operated with full capacity during peak hours but be influenced by Kalabagh reservoir during August to March. The reduction in head to some extent reduces the power and energy. This research work had analyzed and evaluated the extent of reduced power and energy considering 20 year flow data. Finally conclusion and recommendations are drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd., for technical knowledge sharing internationally.

Medios de comunicación Libros     Paperback Book   (Libro con tapa blanda y lomo encolado)
Publicado 20 de enero de 2010
ISBN13 9783639230994
Editores VDM Verlag Dr. Müller
Páginas 72
Dimensiones 150 × 220 × 10 mm   ·   117 g
Lengua Inglés  

Mas por Sajid Mahmood

Mostrar todo

Más del mismo editor