Analysis of Construction Project Delays and Cost Overruns: Construction Projects in Universities and Higher Education Institutes of Pakistan As Case Study - Attaullah Shah - Libros - Scholars' Press - 9783639713275 - 9 de abril de 2014
En caso de que portada y título no coincidan, el título será el correcto

Analysis of Construction Project Delays and Cost Overruns: Construction Projects in Universities and Higher Education Institutes of Pakistan As Case Study

Precio
Mex$ 3.752
sin IVA

Pedido desde almacén remoto

Entrega prevista 2 - 12 de nov.
Recibe notificaciones sobre nuevos lanzamientos de Attaullah Shah
Añadir a tu lista de deseos de iMusic

Aún no valorado

The books takes a holistic picture of construction projects delays and cost overruns by examining real projects. The major causes of project delays and cost overruns have been identified on the basis of questionnaire survey from the major stakeholders, including contractors, designers, sponsors and project managers. The analysis has revealed that cost increases, time delays and poor quality are three major concerns in the construction projects of Higher Education Sector of Pakistan. In the economic analysis, the delayed part of the projects has been analyzed on the basis of actual costs from the real time cost data. The Construction Price Index has been calculated on the basis of increases in the costs of delayed items of work. The book is recommended for the graduate students of Construction and Project management. It is also useful for the undergraduate students to develop their perceptions about the project management. For the students in Pakistan, the book can provide valuable information about the factors leading to project delays and cost overruns of construction projects

Medios de comunicación Libros     Paperback Book   (Libro con tapa blanda y lomo encolado)
Publicado 9 de abril de 2014
ISBN13 9783639713275
Editores Scholars' Press
Páginas 120
Dimensiones 150 × 7 × 226 mm   ·   197 g
Lengua Alemán  

Mas por Attaullah Shah