Cost Management in Construction Industry: an Optimised Holistic Approach - Tazyeen Ahmad - Libros - LAP LAMBERT Academic Publishing - 9783659225024 - 31 de agosto de 2012
En caso de que portada y título no coincidan, el título será el correcto

Cost Management in Construction Industry: an Optimised Holistic Approach

Precio
Mex$ 1.266
sin IVA

Pedido desde almacén remoto

Entrega prevista 3 - 13 de ago.
Recibe notificaciones sobre nuevos lanzamientos de Tazyeen Ahmad
Añadir a tu lista de deseos de iMusic

Aún no valorado

The magnitude of investment involved in civil engineering works is huge at individual level as well as the national level, a small percentage of saving in a civil engineering project is a big amount. In this book cost saving techniques for construction projects has been discussed at every stage of construction it implies right from conceptual phase to the final commissioning or operational phase of the project. The dogma of the book is estimate is an opinion, price is a policy and cost is a fact. Throughout the text rigor and relevance both have been maintained. The book is a harmonious blend of theory and practice. It caters the need of field and class room both.

Medios de comunicación Libros     Paperback Book   (Libro con tapa blanda y lomo encolado)
Publicado 31 de agosto de 2012
ISBN13 9783659225024
Editores LAP LAMBERT Academic Publishing
Páginas 452
Dimensiones 150 × 25 × 226 mm   ·   657 g
Lengua Inglés