The Application of Last Planner System in Construction Design: Enhancing Collaboration and Decision-making - Matteo Cremona - Libros - LAP LAMBERT Academic Publishing - 9783659507106 - 20 de diciembre de 2013
En caso de que portada y título no coincidan, el título será el correcto

The Application of Last Planner System in Construction Design: Enhancing Collaboration and Decision-making

Precio
Mex$ 929
sin IVA

Pedido desde almacén remoto

Entrega prevista 18 de ago. - 3 de sep.
Recibe notificaciones sobre nuevos lanzamientos de Matteo Cremona
Añadir a tu lista de deseos de iMusic

Aún no valorado

The improvement of the work-flow reliability and the process predictability represents a key factor in order to enhance the design process in construction, offering huge opportunities for increasing the performance of both the single project and the industry sector. Moreover, taking into consideration the impact of collaboration on the overall project outcomes, the research has recognised the necessity for the practitioners in construction, to exceed the conventional design management practices, reorganising the entire process, in a way that, the wastes are eliminated and the value of the product is maximised. In this sense, a series of interventions has been individuated in order to achieve the objectives. However, the research focuses on the application of the Last Planner System, as a managerial technique able to improve the design planning and control process, to establish proactive interactions among all the project participants, and to enhance the decision-making activities.

Medios de comunicación Libros     Paperback Book   (Libro con tapa blanda y lomo encolado)
Publicado 20 de diciembre de 2013
ISBN13 9783659507106
Editores LAP LAMBERT Academic Publishing
Páginas 132
Dimensiones 150 × 8 × 225 mm   ·   204 g
Lengua Inglés