Risk Management As a Project Management Challenge: Evaluation of Risk Factors and Strategies in Schedule Delays and Cost Overruns: a Study from the Perspective of Industrial Projects in Peru - Fany Arroyo - Libros - LAP LAMBERT Academic Publishing - 9783844316957 - 26 de abril de 2011
En caso de que portada y título no coincidan, el título será el correcto

Risk Management As a Project Management Challenge: Evaluation of Risk Factors and Strategies in Schedule Delays and Cost Overruns: a Study from the Perspective of Industrial Projects in Peru

Precio
Mex$ 804
sin IVA

Pedido desde almacén remoto

Entrega prevista 21 de sep. - 1 de oct.
Recibe notificaciones sobre nuevos lanzamientos de Fany Arroyo
Añadir a tu lista de deseos de iMusic

Aún no valorado

In general, project success is usually measured in terms of scope, time, cost, and quality. In addition, critical risks factors are also related to scope, time, cost, and quality, as well as the risk strategies. Projects in industrial sectors in Peru are not exceptions. The stable Peruvian economy has attracted important public and private investments such that the number of industrial projects has increased considerably during the last decade. Despite this attractive context, industrial projects are failing to achieve their objectives due to schedule delays and cost overrun problems. The objective of this research is to identify and evaluate the critical risk factors that cause these schedule delays and cost overrun problems, as well as determine effective strategies for the avoidance of risks. The perception of Peruvian project participants in this research regarding risk management is quite fundamental for our assessment. A comparison with the perception of project participants from other countries is also a contribution to this research.

Medios de comunicación Libros     Paperback Book   (Libro con tapa blanda y lomo encolado)
Publicado 26 de abril de 2011
ISBN13 9783844316957
Editores LAP LAMBERT Academic Publishing
Páginas 84
Dimensiones 150 × 5 × 226 mm   ·   143 g
Lengua Alemán